| Feedback Form | Tiếng Việt |

 
 
 

PHU MY 1 INDUSTRIAL ZONE

 

 

 

  1. Investor : Ba Ria-Vung Tau Urban Development and Construction Company

  2. Location :Phu My town, Tan Thanh District, Ba Ria-Vung Tau province; near the National Route 51; about 75 kilometres from Ho Chi Minh City, and 40 kilometres approximately  from Vung Tau.

  3. Surface land : 954.4 hectares, in which industrial land is 651 hectares

  4. IZ functions : heavy  industry such as electronics, fertilizer, steel, material construction, chemicals, warehouses and parking

  5. Total investment capital : 879.44 billion VND

  6. Internal road system :

  • Central road (row : 46m) : with total length of 1,500 m

  • The main road:

  • 2-2 Section road (row : 50m) with total length of 4.191m

  • 4-4 Section road (row : 31m) with total length of 13.943m

  • Lane (row : 23m) with total length of 5,180 m

  1. Power supply :

  • Main power supply : Phu My Power plant

  • 110 KV line with two outputs starting from Phu My power plant to two transformer station 110/22KV in the industrial zones, with a total capacity of 2x40 MVA and 2x63 MVA

  1. Water supply :

  • Water supply : My Xuan underground water plant, Toc Tien and Phu My surface water plant with a total capacity of 40,000 m3/day and night

  1. Waste water drainage system :

  • Waste water will be treated first at the factory and 2nd time at a common facility, as stipulated by the TCVN 59 Standard. Then it will run into the reservoir for natural conditioning.

  • Two waste water drainage system with total capacity of 18.000 cum per day.

  1.  Rain water drainage system :

  • The rain water drainage system will be designed in accordance with the topography in such a way that water can drain most rapidly. There will be 3 drainage areas :

  • The port drainage area to the Thi Vai river

  • The Northern drainage area : a part of water will flow to Dao Spring, the other part will flow into the canals of Phu My thermo-electric plant.

  • Water in the Southern drainage area will flow into flood control reservoir

  1. Fire fight and prevention :

  • There will be a fire fight and prevention station for the whole Industrial Park. But each individual investor in the industrial park shall install his/her own fire fight facility for his/her factory activities.

  1. Waste treatment :

  • Waste area : 7 ha, classified according to kinds of waste, and then taken to waste treatment plant.

13.    Investment projects to be encouraged :

  • Joint venture in capital contribution to build infrastructure

  • Heavy industry closely associated with ports

  • Electrical industry, chemicals, fertilizers

  • Steel production, construction materials

  • Large scale industry

14.    The land rental : about US$ 1.4/sq.m/year


38 Nguyen Truong To St., Ward 3, Vung Tau City, Ba Ria-Vung Tau Province, Vietnam.
Tel: (84-064) 856597 - 856594 - 856120   Fax: (84-064) 856594 Email:
ngoaivubrvt@hcm.vnn.vn

 
 

Copyright©2002 FOREIGN AFFAIRS DEPARTMENT OF BA RIA - VUNG TAU PROVINCE. All Rights Reserved. Website developed by: Sông Mây-Net Solutions