Investor : Ba
Ria-Vung Tau Urban Development and Construction Company
Location :Phu My
town, Tan Thanh District, Ba Ria-Vung Tau province; near the
National Route 51; about 75 kilometres from Ho Chi Minh
City, and 40 kilometres approximately from Vung Tau.
Surface land :
954.4 hectares, in which industrial land is 651 hectares
IZ functions :
heavy industry such as electronics, fertilizer, steel,
material construction, chemicals, warehouses and parking
Total investment
capital : 879.44 billion VND
Internal road
system :
Central road (row : 46m) : with
total length of 1,500 m
The main road:
2-2 Section road (row : 50m)
with total length of 4.191m
4-4 Section road (row : 31m)
with total length of 13.943m
Lane (row : 23m) with total
length of 5,180 m
Power supply :
Main power supply : Phu My Power
plant
110 KV line with two outputs
starting from Phu My power plant to two transformer station
110/22KV in the industrial zones, with a total capacity of
2x40 MVA and 2x63 MVA
Water supply :
Water supply : My Xuan
underground water plant, Toc Tien and Phu My surface water
plant with a total capacity of 40,000 m3/day and
night
Waste water
drainage system :
Waste water will be treated
first at the factory and 2nd time at a common
facility, as stipulated by the TCVN 59 Standard. Then it
will run into the reservoir for natural conditioning.
Two waste water drainage system
with total capacity of 18.000 cum per day.
Rain water
drainage system :
The rain water drainage system
will be designed in accordance with the topography in such a
way that water can drain most rapidly. There will be 3
drainage areas :
The port drainage area to the
Thi Vai river
The Northern drainage area : a
part of water will flow to Dao Spring, the other part will
flow into the canals of Phu My thermo-electric plant.
Water in the Southern drainage
area will flow into flood control reservoir
Fire fight and
prevention :
There will be a fire fight and
prevention station for the whole Industrial Park. But each
individual investor in the industrial park shall install
his/her own fire fight facility for his/her factory
activities.
Waste treatment
:
Waste area : 7 ha, classified
according to kinds of waste, and then taken to waste
treatment plant.
13.Investment projects
to be encouraged :
Joint venture in capital
contribution to build infrastructure
Heavy industry closely
associated with ports
Electrical industry, chemicals,
fertilizers
Steel production, construction
materials
Large scale industry
14.The land rental :
about US$ 1.4/sq.m/year
The
proportion of fulfilling land rental in Phu My I IZ until
2001 is 47.7%.